{"id":2984,"date":"2025-06-19T19:42:51","date_gmt":"2025-06-19T11:42:51","guid":{"rendered":"https:\/\/www.ledphotometer.com\/blog\/impact-test-apparatus-for-conduit-cable-buried-underground\/"},"modified":"2025-06-19T19:42:51","modified_gmt":"2025-06-19T11:42:51","slug":"yeraltina-gomulu-kablo-kanali-icin-darbe-test-cihazi","status":"publish","type":"post","link":"https:\/\/ledtestsystem.com\/tr\/urunler\/yeraltina-gomulu-kablo-kanali-icin-darbe-test-cihazi\/","title":{"rendered":"Yeralt\u0131na G\u00f6m\u00fcl\u00fc Boru Kablolar\u0131 \u0130\u00e7in Darbe Test Cihaz\u0131"},"content":{"rendered":"<p>Yeralt\u0131na g\u00f6m\u00fcl\u00fc kablolar i\u00e7in LS-B64 Darbe Test Cihaz\u0131, IEC\/EN 61386-24 Madde 10.3 ve \u015eekil 101 (GB 20041.24 Madde 10.3 ve \u015eekil 101) gerekliliklerine tam olarak uygun \u015fekilde tasarlanm\u0131\u015f ve \u00fcretilmi\u015ftir.\u00a0<\/p>\n<p><strong>Numune haz\u0131rlama<\/strong>: (200\u00b15) mm uzunlu\u011funda 12 adet boru veya boru aksesuar\u0131 \u00f6rne\u011fi al\u0131n. Borular ayr\u0131 ayr\u0131, aksesuarlar ise borularla birle\u015ftirildikten sonra test edilir. Gerekirse, aksesuarlar (sonu\u00e7lar\u0131 etkilemeden) k\u0131salt\u0131labilir. A\u011f\u0131r \u00e7eki\u00e7in ba\u015f ve k\u0131lavuz tertibat\u0131 dahil k\u00fctlesini belirleyin.<\/p>\n<p><strong>Test ko\u015fullar\u0131<\/strong>Test cihaz\u0131 sa\u011flam bir d\u00fczlem \u00fczerine yerle\u015ftirilir ve numuneler 2 saat boyunca (-5\u00b11)\u2103&#039;lik bir so\u011fuk kutuda \u00f6n i\u015flemden ge\u00e7irilir. \u00c7\u0131kar\u0131ld\u0131ktan sonra, V \u015feklinde bir blok yerle\u015ftirilir (bkz. \u015eekil 101). So\u011fuk kutunun \u00e7\u0131kar\u0131lmas\u0131ndan darbenin tamamlanmas\u0131na kadar ge\u00e7en s\u00fcre \u226410 saniyedir.<\/p>\n<p><strong>Test i\u015flemi<\/strong>A\u011f\u0131r \u00e7eki\u00e7 her numuneye bir kez darbe vurur ve enerji de\u011feri Tablo 102&#039;ye g\u00f6re belirlenir; aksesuarlar en zay\u0131f noktada (giri\u015ften \u22655 mm uzakl\u0131kta) test edilir ve boru uzunlu\u011funun ortas\u0131nda test edilir.<\/p>\n<p><div id=\"attachment_17097\" style=\"width: 649px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" aria-describedby=\"caption-attachment-17097\" decoding=\"async\" class=\"wp-image-17097 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/9f953363-7b6a-4460-9f3b-d61a1feb2e15.png\" alt=\"EN 61386-24:2011 standard\u0131n\u0131n Madde 10.3&#039;\u00fc\" width=\"639\" height=\"836\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/9f953363-7b6a-4460-9f3b-d61a1feb2e15.png 639w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/9f953363-7b6a-4460-9f3b-d61a1feb2e15-306x400.png 306w\" sizes=\"auto, (max-width: 639px) 100vw, 639px\" title=\"\"><\/p>\n<p id=\"caption-attachment-17097\" class=\"wp-caption-text\"><span style=\"color: #ff0000;\">EN 61386-24:2011 standard\u0131n\u0131n Madde 10.3&#039;\u00fc<\/span><\/p>\n<\/div>\n<div id=\"attachment_17098\" style=\"width: 616px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" aria-describedby=\"caption-attachment-17098\" decoding=\"async\" class=\"wp-image-17098 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/da1c66a8-f17e-49d6-a40f-2ec8b9c93b10.png\" alt=\"EN 61386-24:2011 standard\u0131n\u0131n \u015eekil 101&#039;i\" width=\"606\" height=\"807\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/da1c66a8-f17e-49d6-a40f-2ec8b9c93b10.png 606w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2025\/06\/da1c66a8-f17e-49d6-a40f-2ec8b9c93b10-300x400.png 300w\" sizes=\"auto, (max-width: 606px) 100vw, 606px\" title=\"\"><\/p>\n<p id=\"caption-attachment-17098\" class=\"wp-caption-text\"><span style=\"color: #ff0000;\">EN 61386-24:2011 standard\u0131n\u0131n \u015eekil 101&#039;i<\/span><\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The LS-B64 Impact Test Apparatus for Conduit Cable Buried Underground is designed and manufactured in full accordance with the requirements of IEC\/EN 61386-24 Clause 10.3 and Figure 101 (GB 20041.24 Clause Clause 10.3 and Figure 101).\u00a0 Sample preparation: Take 12 samples of conduits or conduit accessories with a length of (200\u00b15) mm. The conduits are [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[678],"class_list":["post-2984","post","type-post","status-publish","format-standard","hentry","category-products","tag-ls-b64"],"_links":{"self":[{"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/posts\/2984","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/comments?post=2984"}],"version-history":[{"count":0,"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/posts\/2984\/revisions"}],"wp:attachment":[{"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/media?parent=2984"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/categories?post=2984"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ledtestsystem.com\/tr\/wp-json\/wp\/v2\/tags?post=2984"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}